SAVE UP TO 50% IN JUST 60 SECS!
Compare free conservatory roof repair quotes from East Kilbride roofers. Covering St Leonards, The Murray, Greenhills, Westwood, Whitehills, Calderwood...
Updated: 13 Feb 2026
13 Feb 2026
Westwood: Downpipe/Spout Unblock & Test on about 12m² Box Gutter / Drainage. Backfall towards the lantern base. Front driveway, easy ladder access. first seen this winter. Ongoing maintenance request.
9 Feb 2026
Whitehills: Inspection: Secure Loose Glazing Bar Cap on small roof (12m²) Polycarbonate. Noise transmission in heavy rain – seek damping options. Front driveway, easy ladder access.
8 Feb 2026
Polycarbonate Panel Repack & Refix — Polycarbonate, about 14m² (The Murray). Panel slipped under storm load. Scaffold tower likely (two-storey rear). only apparent after snow melt.
7 Feb 2026
Wind Noise – Lantern Cap Adjustment in Hairmyres on approx. 12 square metres Lantern / Skylight (T-shaped) conservatory roof. Issue: Ridge junction weeping under driving rain. Access: Access only via conservatory itself (internal). recurring issue despite previous patch.
3 Feb 2026
Westwood: Draft-Proof Roof Perimeter on 20m² Gaskets & Trims (uPVC). Colour-faded trims needing like-for-like swap. Full scaffold needed due to height/obstructions. problem ongoing since last autumn. Request from landlord of rental property.
2 Feb 2026
Leaking Glass Conservatory Roof in St Leonards on about 18m² Glass conservatory roof. Issue: Glazing beads not seated evenly after movement. Access: Over conservatory extension — requires roof ladder. Homeowner preparing to sell.
30 Jan 2026
Outlet Reseal — Box Gutter / Drainage, larger roof (~16m²) (Nerston). Draughts at roof edge or vent. Over conservatory extension — requires roof ladder.
26 Jan 2026
Annual Box Gutter Service (rear conservatory) in College Milton on 6m² Box Gutter / Drainage conservatory roof. Issue: Perished mastic at outlet. Access: Scaffold tower likely (two-storey rear). Request from landlord of rental property.
24 Jan 2026
Rebed Ridge System (clip/adhesive) (P-shaped) — Tiled Warm Roof, small roof (9m²) (Nerston). Odour of damp detected after storms. Conservatory roof fragile - boards required. after last week’s heavy rain. Homeowner preparing to sell.
23 Jan 2026
Hairmyres: Outlet Reseal on approx. 18 square metres Box Gutter / Drainage (P-shaped). Bird nesting material blocking weirs. Front driveway, easy ladder access. Ongoing maintenance request.
18 Jan 2026
Nerston: Misted Double-Glazed Roof Unit on approx. 18 square metres Glass. Minor scratches/etching reducing clarity. Steep garden slope complicates ladder setup. appeared suddenly after recent heatwave. Homeowner preparing to sell.
18 Jan 2026
Nerston: uPVC Trims – Reclip & Seal on small roof (10m²) Gaskets & Trims (uPVC). Colour-faded trims needing like-for-like swap. Steep garden slope complicates ladder setup.
| Job | Basis | Typical Range |
|---|---|---|
| Replace one polycarbonate panel | per panel | £158 - £315 |
| Replace one glass roof unit | per unit | £263 - £525 |
| Box gutter clean & reseal | job | £126 - £263 |
| Lead flashing renewal | job | £210 - £420 |
| Replace glazing bar gaskets | per bar | £84 - £158 |
| End cap replacement set | set | £63 - £126 |
| Internal reseal against leaks | job | £158 - £315 |
| Full polycarbonate roof re-sheet | 20m² | £1,890 - £2,940 |
| Lightweight tiled roof conversion | 20m² | £6,300 - £10,500 |
| Add insulation & plaster ceiling | 20m² | £1,575 - £2,625 |
Guide prices only. Actual quotes vary by access, substrate condition, detailing, and material choice.
| Type | Number | Share |
|---|---|---|
| Gaskets & Trims (uPVC) | 4 | 13% |
| Box Gutter / Drainage | 10 | 33% |
| Lantern / Skylight | 4 | 13% |
| Tiled Warm Roof | 3 | 10% |
| Polycarbonate | 3 | 10% |
| Glass | 5 | 17% |
| Flashing / Wall Abutment | 1 | 3% |
(Number of quote requests received in and around East Kilbride over the previous 12 weeks)
11 Feb 2026
Localised leak on Polycarbonate traced to gasket shrinkage. Joints cleaned and re-sealed; drainage paths cleared. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Trace | Hose test; identify ingress point. | 21 |
| Seal | Replace/augment gaskets; apply sealant sparingly. | 22 |
| Drainage | Clear box gutter/outlets; final check. | 17 |
Estimated time: ~60 minutes
4 Feb 2026
UV-brittle trims renewed on Gaskets & Trims (uPVC); neat seal finishes to prevent water tracking. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Remove | Carefully remove damaged trims. | 17 |
| Replace | Install new trims; align. | 22 |
| Seal | Run clean seal beads; tidy. | 12 |
Estimated time: ~51 minutes
We always recommend hiring qualified East Kilbride conservatory roof specialists for leaks, replacements or structural issues. For confident homeowners with the right tools and PPE, small maintenance jobs such as clearing gutters, replacing end caps, or resealing trims may sometimes be attempted yourself.
We’re still gathering supplier information for East Kilbride.
In the meantime, you can search for conservatory roof suppliers in East Kilbride on Google Maps.
Note: Listings are for convenience only; we do not recommend or endorse any individual supplier.
Hamilton - 5.1 miles
11 Feb 2026
Glasgow - 7.3 miles
13 Feb 2026
Motherwell - 7.4 miles
11 Feb 2026