SAVE UP TO 50% IN JUST 60 SECS!
Compare free conservatory roof repair quotes from Ipswich roofers. Covering Chantry, Castle Hill, Rushmere, Whitton, Gainsborough, Stoke Park...
Updated: 30 Dec 2025
30 Dec 2025
Wind Noise – Lantern Cap Adjustment — Lantern / Skylight, approx. 9 square metres (Stoke Park). Difficulty closing conservatory doors after damp. Steep garden slope complicates ladder setup. Homeowner preparing to sell.
29 Dec 2025
Skylight Flashing Reseal in Bramford on 16m² Lantern / Skylight conservatory roof. Issue: Internal staining on plastered reveals. Access: Steep garden slope complicates ladder setup. Ongoing maintenance request.
27 Dec 2025
Bixley: After Storm Damage: Leak at Glazing Bar on 22m² Polycarbonate (Lean-to). Screw fixings pulling through after wind uplift. Access via side gate, limited space for tower. recurring issue despite previous patch. Small business owner needs urgent repair.
23 Dec 2025
Annual Box Gutter Service in Rushmere on 22m² Box Gutter / Drainage (Gable-front) conservatory roof. Issue: Outlet pipe reduced by silt and sludge. Access: Access via side gate, limited space for tower. Insurance inspection pending.
22 Dec 2025
Ridge Cap Refix — Tiled Warm Roof, approx. 18 square metres (Gainsborough). Insulation gap causing cold spots. Scaffold tower likely (two-storey rear). noticed during recent storms. Insurance inspection pending.
20 Dec 2025
Joint Cover Replacement in Stoke Park on approx. 10 square metres Gaskets & Trims (uPVC) (Orangery) conservatory roof. Issue: Perimeter draughts at closure trims. Access: Front driveway, easy ladder access. became worse after summer expansion/contraction. Small business owner needs urgent repair.
16 Dec 2025
Glass Unit Repack & Reseal (L-shaped) in Bixley on approx. 10 square metres Glass (Lean-to) conservatory roof. Issue: Failed warm-edge spacer causing misting. Access: Access via side gate, limited space for tower. worsened over the past month.
13 Dec 2025
Warm Roof Leak Investigation in Bramford on approx. 15 square metres Tiled Warm Roof (Gable-front) conservatory roof. Issue: Insulation gap causing cold spots. Access: Steep garden slope complicates ladder setup. Ongoing maintenance request.
13 Dec 2025
Fix Noise from Loose Tiles in Wind — Tiled Warm Roof, small roof (9m²) (Bramford). Underlay tear causing local leak. Tight courtyard – debris removal by hand.
8 Dec 2025
Pinewood: Rebed Ridge System (clip/adhesive) (L-shaped) on larger roof (~22m²) Tiled Warm Roof (Victorian). Ridge caps loose after high winds. Over conservatory extension — requires roof ladder. Ongoing maintenance request.
8 Dec 2025
Annual Box Gutter Service (Edwardian) in Whitton on 22m² Box Gutter / Drainage conservatory roof. Issue: Gutter lining blistered and leaking. Access: Full scaffold needed due to height/obstructions. Request from landlord of rental property.
2 Dec 2025
Misted Double-Glazed Roof Unit — Glass, about 8m² (Bramford). Glazing beads not seated evenly after movement. Shared boundary access agreed with neighbour. worsened over the past month. Homeowner preparing to sell.
| Job | Basis | Typical Range |
|---|---|---|
| Replace one polycarbonate panel | per panel | £159 - £318 |
| Replace one glass roof unit | per unit | £265 - £530 |
| Box gutter clean & reseal | job | £127 - £265 |
| Lead flashing renewal | job | £212 - £424 |
| Replace glazing bar gaskets | per bar | £85 - £159 |
| End cap replacement set | set | £64 - £127 |
| Internal reseal against leaks | job | £159 - £318 |
| Full polycarbonate roof re-sheet | 20m² | £1,908 - £2,968 |
| Lightweight tiled roof conversion | 20m² | £6,360 - £10,600 |
| Add insulation & plaster ceiling | 20m² | £1,590 - £2,650 |
Guide prices only. Actual quotes vary by access, substrate condition, detailing, and material choice.
| Type | Number | Share |
|---|---|---|
| Box Gutter / Drainage | 6 | 20% |
| Glass | 7 | 23% |
| Gaskets & Trims (uPVC) | 5 | 17% |
| Lantern / Skylight | 5 | 17% |
| Tiled Warm Roof | 5 | 17% |
| Flashing / Wall Abutment | 1 | 3% |
| Polycarbonate | 1 | 3% |
(Number of quote requests received in and around Ipswich over the previous 12 weeks)
28 Dec 2025
Localised leak on Polycarbonate traced to gasket shrinkage. Joints cleaned and re-sealed; drainage paths cleared. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Trace | Hose test; identify ingress point. | 19 |
| Seal | Replace/augment gaskets; apply sealant sparingly. | 24 |
| Drainage | Clear box gutter/outlets; final check. | 14 |
Estimated time: ~57 minutes
19 Dec 2025
Minor draught/leak on Glass addressed by repacking and resealing beads. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Check | Inspect beads; identify gaps. | 12 |
| Repack | Adjust packers; refit beads. | 18 |
| Seal | Run neat perimeter bead. | 8 |
Estimated time: ~38 minutes
We always recommend hiring qualified Ipswich conservatory roof specialists for leaks, replacements or structural issues. For confident homeowners with the right tools and PPE, small maintenance jobs such as clearing gutters, replacing end caps, or resealing trims may sometimes be attempted yourself.
We’re still gathering supplier information for Ipswich.
In the meantime, you can search for conservatory roof suppliers in Ipswich on Google Maps.
Note: Listings are for convenience only; we do not recommend or endorse any individual supplier.
Colchester - 15.6 miles
30 Dec 2025
Chelmsford - 36.5 miles
28 Dec 2025
Norwich - 40.2 miles
31 Dec 2025