SAVE UP TO 50% IN JUST 60 SECS!
Compare free conservatory roof repair quotes from Warrington roofers. Covering Great Sankey, Penketh, Lymm, Culcheth, Orford, Bewsey...
Updated: 31 Dec 2025
31 Dec 2025
Underlay Patch & Rebatten (localised) — Tiled Warm Roof, approx. 14 square metres (Stockton Heath). Underlay tear causing local leak. Full scaffold needed due to height/obstructions.
24 Dec 2025
Low-E / Solar Control Unit Replacement in Padgate on about 10m² Glass (Gable-front) conservatory roof. Issue: Loose packers causing rattling and draughts. Access: Over conservatory extension — requires roof ladder.
24 Dec 2025
Lymm: Warm Roof Leak Investigation on 6m² Tiled Warm Roof. Poorly sealed eaves trim. Steep garden slope complicates ladder setup. appeared suddenly after recent heatwave. Small business owner needs urgent repair.
18 Dec 2025
Secure Loose Glazing Bar Cap — Polycarbonate, 8m² (Appleton). Blocked gutters/downpipes after storms. Conservatory roof fragile - boards required. Ongoing maintenance request.
17 Dec 2025
Lymm: Replace Perished Gaskets on approx. 12 square metres Gaskets & Trims (uPVC) (T-shaped). Noisy rain on polycarbonate reported. Narrow side passage; debris removal tricky. worsened over the past month. Request from landlord of rental property.
17 Dec 2025
UV-Damaged Trim Replacement in Penketh on 22m² Gaskets & Trims (uPVC) conservatory roof. Issue: Loose bar caps letting wind-driven rain in. Access: Rear garden only, narrow ladder access.
9 Dec 2025
Stockton Heath: Failed Roof Unit Replacement (Orangery) on about 16m² Glass. Condensation visible on cool mornings. Access via side gate, limited space for tower. Insurance inspection pending.
8 Dec 2025
Overflow Baffle/Deflector Install in Penketh on approx. 8 square metres Box Gutter / Drainage conservatory roof. Issue: Outlet pipe reduced by silt and sludge. Access: Full scaffold needed due to height/obstructions.
8 Dec 2025
Orford: Polycarbonate Edge Trim Repair on 15m² Polycarbonate (Gable-front). Noise transmission in heavy rain – seek damping options. Scaffold tower likely (two-storey rear). noticed while cleaning roof panels. Small business owner needs urgent repair.
2 Dec 2025
Appleton: Replace Damaged Verge Trim on about 18m² Tiled Warm Roof (Orangery). Condensation due to blocked ventilation path. Access only via conservatory itself (internal). recurring issue despite previous patch.
28 Nov 2025
Inspection: Lightweight Tile Repair in Latchford on 20m² Tiled Warm Roof conservatory roof. Issue: Fixings backed out on south-facing pitch. Access: Shared boundary access agreed with neighbour. noticed during recent storms.
26 Nov 2025
Replace Damaged Verge Trim in Latchford on approx. 18 square metres Tiled Warm Roof conservatory roof. Issue: Sealant failure at hip/ridge junction. Access: Scaffold tower likely (two-storey rear). after last week’s heavy rain.
| Job | Basis | Typical Range |
|---|---|---|
| Replace one polycarbonate panel | per panel | £152 - £303 |
| Replace one glass roof unit | per unit | £253 - £505 |
| Box gutter clean & reseal | job | £121 - £253 |
| Lead flashing renewal | job | £202 - £404 |
| Replace glazing bar gaskets | per bar | £81 - £152 |
| End cap replacement set | set | £61 - £121 |
| Internal reseal against leaks | job | £152 - £303 |
| Full polycarbonate roof re-sheet | 20m² | £1,818 - £2,828 |
| Lightweight tiled roof conversion | 20m² | £6,060 - £10,100 |
| Add insulation & plaster ceiling | 20m² | £1,515 - £2,525 |
Guide prices only. Actual quotes vary by access, substrate condition, detailing, and material choice.
| Type | Number | Share |
|---|---|---|
| Lantern / Skylight | 4 | 14% |
| Tiled Warm Roof | 8 | 28% |
| Flashing / Wall Abutment | 3 | 10% |
| Gaskets & Trims (uPVC) | 3 | 10% |
| Glass | 4 | 14% |
| Box Gutter / Drainage | 3 | 10% |
| Polycarbonate | 4 | 14% |
(Number of quote requests received in and around Warrington over the previous 12 weeks)
31 Dec 2025
Localised leak on Tiled Warm Roof traced to eaves trim; resealed and fasteners tightened. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Trace | Hose test; isolate source. | 15 |
| Reseal | Apply sealant; replace failed strip. | 17 |
| QA | Re-test; photo log. | 11 |
Estimated time: ~43 minutes
19 Dec 2025
Localised leak on Polycarbonate traced to gasket shrinkage. Joints cleaned and re-sealed; drainage paths cleared. Autumn/Winter weather likely contributed.
| Step | Description | Minutes |
|---|---|---|
| Trace | Hose test; identify ingress point. | 18 |
| Seal | Replace/augment gaskets; apply sealant sparingly. | 24 |
| Drainage | Clear box gutter/outlets; final check. | 14 |
Estimated time: ~56 minutes
We always recommend hiring qualified Warrington conservatory roof specialists for leaks, replacements or structural issues. For confident homeowners with the right tools and PPE, small maintenance jobs such as clearing gutters, replacing end caps, or resealing trims may sometimes be attempted yourself.
We’re still gathering supplier information for Warrington.
In the meantime, you can search for conservatory roof suppliers in Warrington on Google Maps.
Note: Listings are for convenience only; we do not recommend or endorse any individual supplier.
Wigan - 10.8 miles
22 Dec 2025
Salford - 14.0 miles
25 Dec 2025
Bolton - 14.7 miles
26 Dec 2025